Turn-key 2000L per hour yoghurt milk production line
Complete Dairy Processing Line
Specific Description
Dairy processing lines mainly use fresh cow or goat milk etc as raw material through different processing method, which can be manufactured into various food products.
You can use cow milk, goat milk, camel milk and mare's milk etc as raw material, through clarification, cream separation, pasteurization, homogenization, degassing, fermentation, blending, UHT sterilization, filling etc flow procedure, and filling them into Pre-pak pouch, Brick-shape carton, Plastic bag, Gable top bag, plastic cup, plastic bottle etc containers, which can get various types of finished products like pasteurized milk, pure milk, yogurt, flavored milk, milk beverage, condensed milk, single cream, butter, milk slag, cheese etc, and their shelf life can be ranged from 2 day or even 2 years.
DEscriptION
Characteristics:
Processing capacity can be ranged from 2T/Day to 1000T/Day.
You can process cow(goat)milk etc into various liquid or non-liquid dairy products.
High standard design, manufacture and project installation requirements, which guarantee the first-class finish products in the dairy processing line.
PLC control the whole production line, saving labor force and facilitate production management.
Full-auto CIP cleaning, to ensure whole production line equipments meet food sanitary safety requirements.
ADVANTAGES AND STRONG POINTS
Technical parameters
Raw material | Fresh cow(goat)milk and milk powder |
End product | Various pure milk, yogurt, flavored milk, milk beverage, butter, cheese etc |
Capacity | 2T/D – 1000T/D |
End product package | Pre-pak pouch, Brick-shape carton, Gable Top bag, plastic bottle, plastic cup, glass bottle etc |
Commercial terms
*Terms of Payment: 30% TT as down payment, the balance beofre loading,
or 100%L/C at sight against shipping documents ;
*Offer duration and Validity: the quote be valid in 30 days since the price date
*Delivery time:
120 days after receive TT deposit or formal 100% L/C, upon approval on technical drawings and specifications by client.
*Duration of Guarantee:
1.within 12 months since the installation and commissioning of equipment are finished, If the defects of equipment and spare parts result from the seller, the seller will supply spare parts and maintenance by free of charge. If the defects result from the buyer’s improper use of equipment, seller will charge the cost of maintenance and spare parts.
2.After 12 months since the installation finished, if the equipment and spare parts are defected, the seller will charge the cost of maintenance and spare parts.
3. If Buyer request Seller and engineer to Buyer's factory, buyer should supply seller’s workers the round trip air tickets and $80 dollars for each worker per day. And the local traffic, accommodation and lodging fees should also be available.
*installation terms:
1.50 days for installation and commissioning.
2.BEYOND CO., provide installation, commissioning of all equipment supplied by BEYOND CO., as stated in the quotations.
3.buyer provide round way air tickets,local traffic , room and board,in addition pay $100 per day for each engineer.