Product Description
Railway Construction material High Strength Biaxial Plastic Geogrid
- Made from polymer and nanometer carbon black by extrusion method.
- Width from 2m to 6m
Specification
TGSG1515, TGSG2020, TGSG2525, TGSG3030, TGSG3535, TGSG4040, TGSG4545, TGSG5050 TGSG6060
Property
- Improve roadbed bearing capacity, enlarge road lifetime
- Prevent road collapse and crack
- Prevent sail and water loss in slope
- replace steel-plastic geogrid in coal mining
Packaging & Shipping
PP Plastic geogrid is usually packed by PP woven bags or just
rolled. also it can be determined by the clients requirements.
1. geogrid per roll is 3.9m *50 m.
2. one 40HQ can load 225rolls.
Shipped in5-15 days after 30%T/T deposit payment.
Company Information
Shandong Jin Ruixiang Geotextile Material Co.,Ltd, a high-tech and integration enterprise. The product High Speed Short Fiber Needle Punched Non woven Geotextile, Filament woven geotextile, Three-Layer Co-Extrusion HDPE Film, Environmental protection HDPE Geomembrane and various Geogrid, Geocell, Geonet, Composite Material,Rubber Water-stop series etc.
Quality represents our corporate culture, strictly enforces quality control is our responsibility. High quality, Strict standards, good service.
- New material, the precise formula;
- Advanced equipment, perfect production;
- Real-time detection, strict quality;
- The packaging is solid, ensure the safety of the goods.
Product Application
1. Reinforcement in dam and roadbed.
2. Slope protection.
3. Wall reinforcement.
4. Roadbed bearing capacity improvement in airfield, parking lot and wharf .
FAQ
FAQ
1.Q: Are you a factory or trading company?
A: We are a factory, specialized in geotextilel material.
2.Q: Where is your factory located? How can I visit there?
A: Factory located in Laiwu City, Shandong Province in China. Takes about 1 hour from
Jinan airport to our factory.
3.Q: Can I order samples? Are you free for samples?
A: Yes, we will offer free sample. You pay the sample cost first, but we will pay you back
when you make the bulk order later.
4.Q: How does your factory do regarding quality control?
A: Quality is priority. Quality represents our corporate culture.
5.Q: How about the delivery time?
A: Lead time since receipt of 30% T/T deposit payment, within 5-15days.
6.Q: Can you produce the product according to customers' requirements?
A: Sure, we are professional manufacturer, OEM and ODM are both welcome.