China Manufacturers Schedule 40 Galvanized Carbon Steel Pipe
Product Description
Product name | galvanized pipe |
Technique | Longitudinal Electronic Resistance Welding(ERW) High Frequency Welding(HFW) |
Material Quality | Steel Grade | Q195 similar to a283 GR.B, 040a10, ss330, sphc Q235 similar to a283 GR.D, 080a15,CS type B Q345 similar to a737 GR.B, SS400, S235JR |
| Material Type | Available in cold rolled and hot rolled |
Size | W.T | 0.8mm-2.5mm |
| Diameter | 32mm-114mm |
| Length | 5.8m-12m |
Surface | Galvanized, 3PE, painting, coating oil, steel stamp, drilling, etc |
Ends | Plain ends, cutting, threading, beveled, flange, etc |
Packing | Packing in bundle with steel strips; with seaworthy package at the end; could be done with your requirement. |
Inspection | With Chemical Composition and Mechanical Properties Testing; Hydrostatic Test, Dimensional and Visual Inspection, With Nondestructive Inspection |
Following is the production of steel pipe video, if you are interested you can click to watch.
This product is widely used in
1. Low and middle pressure fluid transportation pipeline
2. Casing Tube
3. Boiler Pipe
4. Petroleunm and natural gas industry
5. Chemistry industry
6. Electric industry
Hot Sell Products
Following are more products.If you are intrerested in these products, you can clik the pictures.
Company Information
We have the most professional team. We hold the priciple of mutual benefit to provide perfect service for customers.
We often take part in all kinds of exhibitons at abroad. We also have lots of partner.
FAQ
Q:Do you accept ODM&OEM orders?
A: Yes, we provide ODM&OEM services to worldwide customers, we are able to customize in
different styles, and sizes in different brands, we also customize packaging box as per your requirements.
Q:What’s the MOQ?
A: MOQ is 5TONS for standardized products; for customized products, MOQ should be negotiated
in advance. There is no MOQ for sample orders.
Q:How long is the lead time?
A: The lead time for sample orders is 3-5 days, for bulk orders is 10-25 days.
Q:How to place orders?
A: 1. Email us the model, brand and quantity, consignee information, shipping way andpayment terms;
2. Proforma Invoice made and sent to you;
3. Complete Payment after /confirm/iing the PI;
4. /confirm/i Payment and arrange production.