Welcome to brushcapital
Home >Construction & Real Estate » Real Estate
QINGDAO BAORUN STEEL STRUCTURE ENGINEERING CO., LTD.
Business units
ChinaVIP0Audited Supplier
Products: Steel Warehouse, Steel Constructure, Metal Buildings, Steel Structure Factory Building, Heavy Structure, Crane Structure, Multi Storey Steel Structure Building, Prefabricated Building, High Rise Steel Structure Building, Steel Fabrication
Response Time: within 24 hours
Response Rate: 100%
View Shop
Chat Now
Add to wish list
+ Add a New List
steel hangar steel building 00054
OverviewQuick DetailsPlace of Origin:Shandong, China (Mainland)Brand Name:steel columnsModel Number:steel engineering maximum dimension L100
$26 /
Stock: 10000 s
Quantity:
-+
Min Order: piece
Buy Now
Add To Cart
Send Inquiry
Seller Support:
Trade Assurance — To protect your orders from payment to delivery
Product Details
Transaction Comments
Overview
Quick Details
Place of Origin:
Shandong, China (Mainland)
Brand Name:
steel columns
Model Number:
steel engineering maximum dimension L10000mxW10000mxH45m
concrete structure:
structure pipe
structural steel beams:
steel reinforcement
design of aircraft hangar:
steel beams aircraft hangar doors
steel design airplane hangar:
steel concrete arch hangar
steel slab hangar door:
reinforced concrete structure sliding hangar doors
Czech Republic:
Cyprus
Cuba:
Croatia
Ivory Coast:
Costa Rica
Cook Islands:
Congo, Republic of (Brazzaville)
steel bridge:
Democratic Republic of the Congo (Kinshasa)
Supply Ability
Supply Ability:
45980 Metric Ton/Metric Tons per Year
Packaging & Delivery
Packaging Details
1.container of 40'OPEN TOP,inside capacity is 12.01mx2.33mx2.15m,Gross weight of allocation is generally 27.0 tons,volumn is 60m3.
2.container of 40 feet HIGH CUBE:Inside capacity is 11.8m x 2.34m x 2.18m,Gross weight of allocation is generally 22 ton,volumn is 54m3.
3.HC container of 45 feet:Inside capacity is 13.58m x 2.34m x 2.71m,Gross weight of allocation is generally 29 ton,volumn is 86m3
Port
QINGDAO SEAPORT,CHINA
Lead Time :
25 days after recieving deposit payment

Specifications

1.Light weight
2.high strength
3.Environmental friendly
4.Easy construction,simple installation
5.large span BR00054

 

 

metal buildings steel sheds steel garage steel frame buildings portable buildings

 

FIRST PART, OUR COMMENTS AND IDEAS:

1. we design,fabricate,export,install following steel structure building projects:

s

design of aircraft hangar

aircraft hangar doors

airplane hangar

industrial hangar

arch hangar

hangar door

sliding hangar doors

single slope steel building

steel building motel

inflatable buildings portable temporary structures

building steel formwork profile

steel building sliding garage door

tugboat building

curved steel building machinery

steel strips polished metal building materials

india famous buildings

2.options1)we can design,fabricate,supply,export,install all kinds of steel structures welded parts,steel buildings,metal building,modular house,steel frame for warehouse,workshop,garage etc,steel beams,H beams,other riveting and welding parts
 2)we can also make and develop new parts according to customer's drawings and detailed dimensions.
3.specifications
 1)size:MOQ is 10m2,including width X length X eave height,roof slope
 2) Type:Single slope, double slope, muti slope; Single span, double-span, Multi-span, single floor, double floor,or three levels
 3) Base:Cement and steel foundation bolts
 4) Column and beam:Material Q345(S355JR)or Q235(S235JR) steel, all bolts connection! Straight cross-s cross-section!
 5) Bracing: X or V or other type bracing made from angle, round pipe, etc
 6) C or z purlin:Size from C120~C320, Z100~Z200
 7) Roof and wall panel:Single colorfull corrugated steel sheet0.326~0.8mm thick, 
 YX28-205-820(820) sandwich panel with EPS, ROCK WOOL, PU etc insulation 
 thickness around 50mm~150mm, width
 8)Accessories:Semi-transparent skylight belts, Ventilators, down pipe, outer gutter, 
 9)Surfrace: Paint or hot dip galvanize!
 10) Packing: Main steel frame without packing load in 40'OT, roof and wall panel load in 40'HQ!
4design parameters, If you need we design for you, pls supply us the following parameter together with detail size:
 1)Live load on roof(KN/M2)
 2)Wind speed(KM/H)
 3)Snow load (KG/M2) if have
 4)Earthquake load if have
 5)Crane (if have) ,Crane span, crane lift height, max lift capacity, max wheel pressure and min whe
  
  
  

 

 

FIRST PART,Steel structure Aircraft maintenance hangar facilities

Location:Guangdong,China

Building type:aircraft maintenance hangar facilities

Construction area: 114421m2

Weight: 9513.09 metric ton

Layout(PDF):

Structural steelwork description:

New airport aircraft maintenance hangar facilities is locaed in South Area of New airport,total construction area is 114421m2,construction area of steel structure building is 23100m2,total structural steelwork consumption is 9513.09 metric ton,it is one of the biggest aircraft maintenance hangar facilities for span and covered area during finished and undertaking hangar facilities.

 

No.11 steel hangar is the centre of whole hangar,the length in south-north direction is 409.04 meters,the width in east-west direction is 134 meters,the maximum span of steel structure is 100 meters + 150 meters + 100 meters,the depth is 102.91 meters,it could simultaneously allow 4 wide-body jets to maintain.

 

No.11 steel hangar is divided into 3 areas:area 1 and area 2 is maintenance area,area 3 is painting area.Structure is steel structure column plus steel roofing system.The steel roofing consists of multi-grades steel truss system in longitudinal and

lateral direction,and roof bracing system:

1. The main truss node adopts welded H steel nodes;

2. The primary member adopts hot rolled H steel,BS5950,50 Grade,British Standard;

3. The roof bracing system adopts hot-rolled square tube and circular tube , BS5950,50 Grade,British Standard.

 

The construction of steel roofing in maintenance area adopt special techniques:

installing into one part on the ground,hydraulic hoisting through computer control.

 

The main construction characteristics and difficulties:

1. Huge hoisting area:the total hoisting area covered is 250m×88m,it is the biggest single building,using integral hoisting techniques to hoist in one time currently in CHINA.

2. Big hoisting weight,big span:the weight reaches 4432t,clear span in the structure is 150m,they are both rare in the similar steel construction projects.

3. Much more Hoisting point-positions:totally 13 hoisting point-positions,32 lifting jacks,the maximum capacity of jacks is 360t.

 

 00014 ac-airplane-hangars.jpg00014-1  aviation-hangar.jpg00014-2  hanger_shadow.jpg

 

 

 1209979218440jpg.jpg

 11.JPG

1201838016009jpg.jpg

 

 

 

 

 

Other products from this supplier
Back to top
X
Added successfully
You have added this product to the wish list successfully !
X
Added successfully
It has now been moved to the top of the list!
Continue shopping
X
Add a New List
Save
cancel