1. simple structure
2. easy instllation
3. top quality
4. competitive price
5. prompt delivery
COMPANY PROFILE
ChuzhouJincheng metalwork Co., Ltd has been producing and suppling all kinds of scaffoldings since 2003. Our main products include ringlock, cuplock, kwikstage scaffolding, frame system, steel deck, post, jack, caster wheel and couplers and so on for aboard.
We have more than 200 workers and cover 10,000 square meters, own pressing, cutting machines, auto- welding line, powder coated production line and loading capacity testing machines and so on.
To make an inquiry, please feel free to contact with me.
PRODUCTS CHARACTRERSTICS
All colors are available from us, we can offer your our colorful cards for comfirmatin you need if necessories.
Regrding to the surface treatment, we can provide such finishes: hot dip galvanized, electro-zinc, painted and powder coated.
specification
Height | Width | Stud center | Weight(lbs) |
5’ | 3’6’’ | 4’ | 39 |
6’4’’ | 3’ | 4’ | 39 |
6’4’’ | 3’6’’ | 4’ | 42 |
6’4’’ | 5’ | 4’ | 45 |
7’6’’ | 6’ | 2’+4’ | 58 |
Packing Details
in factory steel pallet
Delivety Time
- need more or one week to prepare free sample to those who need check quality
- 30-45 days to finish mass production after the order /confirm/iation
Payment Terms
-T/T 30% in advanced
- L/C at sight
APPLICATION
walk through frame have been widely used in construction sites like that
Test Report
Our products have been approved by an internation public organization of ISO9001:2008 and SGS test