2000L/20Hl/20bbl microbrewery equipment,turnkey beer brewing system
1. Who we are:
We are a professional brewery equipment manufacturer in CHINA,have many years’experience on
designing and building brewery equipment,and we have helped many clients build their brewery with
turnkey project.
2. What we do:
We would be very pleased to offer the following service and products:
(1)Home brewery equipment(50L,100L)
(2)Pub brewery equipment.(200L-500L)
(3) Microbrewery with turnkey project(500L-200HL or customized)
(4) We also can supply keg washer,keg filler,kegs etc.
If customers need,we can do on-site installation for our brewery system.
3. The detailed configuration:
1. Milling System | Malt mill+auger+grist hopper+hydrator |
2. Mashing System | Mash tun,lauter tun. |
Kettle/whirlpool tank. |
Hot water tank. |
Heat Exchanger. |
Wort Pump |
Accessory:1. Mashing Pipeline; 2. Operating Plateform; 3. Yeast Feeder; 4. Venturi Tube; 5. Butterfly Valve. |
3. Fermenting System | Fermenter. |
1.Breathe valve2.CIP port 3.Pressure gauge; 4. Sample Valve; 6. Carbonation device; 7.Liquid level gauge.8.Temperature gauge 9.Beer outlet 10. Yeast outlet. |
4. Cooling System | Ice Water Tank |
Chiller |
Ice Water Pump |
Relative Pipes and Valves |
5. CIP System | Acid tank |
Sterilization Tank |
Alkali tank |
6. Controlling System | PLC control:Simenze S7-1200. |
5.Reference pictures for 10BBL brewery equipment we have produced:
5. Packaging & Delivery
(1)LCL/FCL(20GP/40GP/40HQ)
(2)Packed with plastic film in fumigation free wooden case or fixed with iron frame
(3)Up to export standard, suitable for delivery
(4) Customer's requirements available
(5)Terms of payment:usually 50% T/T deposit, 50% T/T before shipment.
(6)Time of shipment:depends on exact order.
6. Guarantee&After Sales Service
(1) This is the whole brewing plant, filling unit proposal being offered separately
(2) The warranty time is 12 months.
(3)Electrical parts fit the local power requirement.
(4)If customer needs, we can appoint our engineer for the installation. The workincluds equipment installatio,
training and first batch brewing.