nano silicone rubber waterproof coating for steel tile
OverviewQuick DetailsType:Other Waterproofing MaterialsPlace of Origin:Shandong, China (Mainland)Brand Name:Jin Lu YangModel Number:JLY-PUwe
$500 /Ton
Product Details
Transaction Comments
Overview
Quick Details
Type:
Other Waterproofing Materials
Place of Origin:
Shandong, China (Mainland)
Brand Name:
Jin Lu Yang
Model Number:
JLY-PU
weight:
20kg/barrel
Material:
silicone rubber, nano composite latex
Color:
transparent, white, pink or customized
Application Method:
roller, bursh or spray
Solid content:
65%
Tack free time:
45min
Permeability:
Permeate into the substrate 0.3mm
Elongation:
600%
Temperature:
-20℃ no cracks
Product Name:
nano silicone rubber waterproof coating for steel tile
Packaging & Delivery
Packaging Details
metal or plastic drums
Delivery Time
one week after the deposite payment
Product Description
silicone rubber waterproof coating
Colorful silicone waterproof coating ingredients: silicone rubber, nano composite latex, other additive agent etc.
It forms a complete and seamless waterproof membrane after the coating curing.
Specification
Name
silicone rubber waterproof coating
Weight
20kg/barrel
Color
transparent, white and other colors are customized
Solid content
65%
Tack free time
45min
Cold flexibility
-20℃
Elongation
600%
Product property
1.It forms a complete and seamless waterproof membrane after the coating curing.
2.Excellent elongation and high tensile strength.
3.Excellent adhesion and permeability to the cement, concrete, wood, colorful steel tile, ceramic,glass etc.
4.Various colors are available.
5.Easy and convenient application.
6.Environment friendly, no toxic, no odour.
Construction
1)Surface must be sound and clean of grease, oil, dust, laitance and all contaminants. Remove all loose materials.
2)The waterproof coating need to brush 3 to 4 layers:
Apply the first layer by roller, brush or airless spray with about 1.5mm to 2.0mm thickness film.
Apply the second layer with the same thickness after the first layer curing. The third and forth layer use the same application method.
3)Need to add protection layer above the waterproof film layer.
Application
Used as the waterproof layer, seepage proof, moisture-proof layer or vapour barrier: Building roof top, basement, shower room, swimming pool, warehouse, bridge. Roof : Concrete flat, sloping roof, roof gutter
Underground construction: basement,
Joint: expansion joint, construction joint, settlement joint, wall pipe, water outfall.
Factory
FAQ
1.Why choose us?
As the professional manufacturer, we can provide the excellent products and best service.
2.Sample and quality
The free samples can be provided for quality inspection. And the customer pay the sample freight. The delivery cost will be returned after placing the order.
3.Carrier and delivery time of sample
Carrier: DHL, UPS, FedEx, TNT or as customer’s requirement. Delivery time: 1-3 working days