Welcome to brushcapital
Home >Construction & Real Estate » Waterproofing Materials
Add to wish list
+ Add a New List
Vapor barrier roofing membrane PE film
OverviewQuick DetailsPlace of Origin:Guangdong, China (Mainland)Brand Name:XinchuangweiModel Number:WB010Type:Waterproof MembraneMaterial:PE
$0 /
Stock: 10000 s
Quantity:
-+
Min Order: piece
Buy Now
Add To Cart
Send Inquiry
Seller Support:
Trade Assurance — To protect your orders from payment to delivery
Product Details
Transaction Comments
Overview
Quick Details
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
Xinchuangwei
Model Number:
WB010
Type:
Waterproof Membrane
Material:
PE
Function:
waterproof, vapour permeability, UV resistance
Thickness:
0.3mm
Application:
roofing, wall
Name:
Waterproof Breathable PE Film Roofing Membrane
Supply Ability
Supply Ability:
1000 Roll/Rolls per Day
Packaging & Delivery
Packaging Details
PP + Carton
Port
Zhongshan port
Lead Time :
Shipped in 7 days after payment
Product Description
Vapor barrier roofing membrane PE film

Vapour barriers or moisture barriers are films made from synthetic materials (usually polyethylene, also called PE films) that should limit the penetration of moisture from the subsurface into the laminate floor. They need only be installed on mineral subfloors such as stone, concrete, asphalt, because under certain climatic conditions water vapour can precipitate as condensation and cause structural damage. The vapour barrier is laid trough-like or “floating”. The rows are laid next to each other with approx. 20cm overlap and affixed with masking tape.

Thickness scope: 0.05mm-0.3mm
Width: maximum 14 meters
Weight per roll: 10-100kgs
Color: black or clear transparent natrual resin color
Material: high quality virgin polyethylene

Detailed Images
Technique data
Appication procedure

Base plane treatment: Base surface should be smooth, hard, of no dust and no pollution, no loose objects, the base plane should be dry when using wet laid method, wet laid method require the base plane should be smooth, no leakage, no water.

Brush treatment agent when laying membrane, treatment agent should stir to mix well, pasting membrane after brushing uniform and dry, other process does not need base plane treatment agent.

Node details treatment: pipe parts should seal first, then paste the attached layer. Corner positions such as internal and external corner, elevation angle, expansion joint, construction joint and other parts of pasting additional layer. Horizontal and vertical width general ≥250 mm.

Pasting waterproof membrane

4.1 Make sure the membrane's pasting sequence and direction, play a line on base plane, then paste the membrane:

Unfolded paste method: cut the membrane in appropriate shape, paste it in opposite way on base plane and shuck off all membrane's isolation paper, paste membrane's one end at a predetermined position, pasting forward along the datum line, then use compression roller to roll on both sides , forward, so that make it stick firmly.

Roll paste method: shuck off all membrane's isolation paper and paste membrane at the same time, carry the membrane to predetermined position, aim at datum line, shuck off membrane's undersurface isolation paper, One end of membrane is fixed, Unfold the membrane about 500mm, then push membrane and used compression roller to roll on both sides , forward at the same time, In order to ensure that the initial bonding strength.

4.2 Lap joint treatment: it can be used lapping, abutting joint and welding according to different materials. Lap width is long side 65 mm and short side 80 mm. Using automatic crawl machine hot air welding lap width is 60 mm; Using 120 mm wide double-sided self-adhesive Sealant to enhance processing when parallel butt joint, then make it become compaction with roller. Ensure sticking firmly between waterproofing materials, not only can use versa pasting method but also can use Mechanical fixed method.

4.3 Repair: it should be repaired when damaged, pasting broken place directly. Repair materials is greater than broken edges 100 mm and compaction, sealing.

Construction on protective layer: Surface protection adopt cement mortar or other lump materials, construction should be paid attention to protect the waterproof layer. The facade adopts polystyrene board or masonry protection.

4.4 Don't put the membranes on base plane which has pollution, water and ice. It is recommended to use double-sided or aluminum foil membrane on the parts of the protective layer needs to be done. It should do the waterproof layer at the end of last procedure, it can't cross construction. If you want to install equipment in the paved membrane, it should be taken to make additional layer of protection measures such as padded block.

Other products from this supplier
Back to top
X
Added successfully
You have added this product to the wish list successfully !
X
Added successfully
It has now been moved to the top of the list!
Continue shopping
X
Add a New List
Save
cancel