Description:
BASIC Anti-static perforated panels are designed to computer rooms for airflow.Basic are able to supply perforated panels of different airflow volumes according to different requirements from the customers. Meanwhile,dampers can be applied to perforated panels, so as to control the volume of airflow.
To meet different needs from customers, Basic also supply various kinds of round outlet boxes, square outlet boxes, panels tuyeres, panel lifters and pedestals of different raised height.
Features:
1.) Size: 600*600*35mm
2.) full steel , HPL or PVC punched tile
3.) surface punched panel which is hard steel of Shanghai Bao steel,
4.) Manual welding for the bottom square tube, origination in domestic.
5 ) Imported paint, anti-rust.
6.) prevent static validly fireproof, dustproof
7.) exact dimension for the hole of tile and panel ,good ventilation function
8.) 17%~50% ventilation rate, satisfies different environmental requirements
Application:
The perfoated panels are widely used in PC rooms, Electrical offices, Information Center, Factory and Ventilation Areas.
Our Service:
Changzhou Basic Company uphold the principle of "a full range,high quality fast"service standards, customer satisfaction as the goal, to the public commitment.
After-sales Service Letter of Commitment:
User quality problems arise in the normal use condition, both steel cementitious bare finish floor and the ceramic raised floor are guaranteed to keep in good repair for 5 years.If quality problems happen in guarantee period, our company will maintain for free.Additionally, our company provides technical support and fittings for life. After-sales service isn’t restricted by time and we will assign technical personnel to solve your problems immediately after receiving telephone or mails and hear feedback idea of users and deal with them in time. If you caught in some problems when using our products, welcome to contact us at any time.
Installation:
1.Requirements to laying site:
1)The laying of antistatic raised access floor shall be carried after the indoor civil engineering and decoration and finished.
2)Ground must be flatness,clean,dry and there shall be no any sundry or dust on it .
3)The construction of cable electric appliance,air pipeline and AC system to be arranged under floor surface shall be finished before the installation of floorings.
4)The base of heavy equipment must be firmed,equipment is installed on the base and the base height shall be align with the upper surface of the floor.
5)The construction site must be equipped with 220V/50HZ power supply and water supply.
2. Tools for installation:
Infrared ray level instrument, large push cutter, aluminum alloy ruler, level bar electric hand drill, Mini type marble cutter, pulling nail gun, wire-cutter, steel ruler, nail, pencil, suction disc machine, adz-eye hammer, spanner, screwdriver, floor glue, tool bag ,broom.
3. Construction Procedures:
1)The flatness of floor and the verticality of wall are carefully checked. If any part is found not to be consistent with construction requirements,it shall be reported to relevant department of Part A.
2)The horizontal lines are pulled and fixed and the installation height of floorings is drawn on the wall using ink line.The floor panels shall be on a same horizontal plane. The indoor length and width are measured. The reference position of laying shall be selected properly in order to decrease the cutting the floorings.
3)The pedestals to be installed are adjusted to a same height as required,and then placed on the decussation position of the grid lines.
4)Stringers are fixed on the pedestals using screws, and every are on a same plane and mutually perpendicular.
5)The floor replaced on the assembled stringers using board sucker.
6)If the rest distanceto the wall is less than the length of floor , the floor can be cut into adequate size before installation.
7)During the laying of floorings,blister gradienter shall be used for levelling and the height of floorings can be adjusted through pedestal.
8)In case that heavy equipment is placed in machine room,additional pedestal shall be installed under the equipment base in order to avoid the deformation of floorings.
9)If it is necessary to cut or open hole on the raised floor,electrical drill shall be used to open in order to avoid the rupture of veneer.
Company Information:
Changzhou Basic Computer Room Equipment Co.,Ltd is an export oriented access floor manufacturer with design, producing and installation. Basic has been certificated in ISO9001, ISO14001 Enviroment System.
Basic covers an area around 30,000 sqaure meters. And more than 200 workers are working in factory now. Basic’s major products include OA Intelligent Building Access Floor Series, Anti-static Steel Access Floor for Computer Room, Conductive Vinyl Tiles for Clean Room,Steel Perforated Floor,Calcium Sulphate Access Floor, Woodcore Panel and Electrical Floor Box.Our annual production capacity is more than 1.2 million square meters. Products manufactured by Basic has been exported to over 20 foreign countries, such as Canada, Singapore, Taiwan, Brazil, Africa and Middle East,etc.
We sincerely look forward to cooperate with every client ,to further bring about a whole new level of service and developing a new chapter in Access Floor Industry together.