C. Crusher
Fusing Italian technology, multiple sets of cross-blade structure, crusher size can be adjusted according to customer or specific project requirements, it will increase the juice juice rate of 2-3% relative to the traditional structure , which is suitable for production of onion sauce, carrot sauce, pepper sauce , apple sauce and other fruits and vegetables sauce and products
D. Double-stage pulping machine
It have tapered mesh structure and the gap with load can be adjusted, frequency control, so that the juice will be cleaner; Internal mesh aperture are based on customer or specific project requirements to order
E. Evaporator
Single-effect, double-effect,triple-effect and multi-effect evaporator, which will save more energy; Under vacuum, continuous low temperature cycle heating to maximize the protection of nutrients in the material as well as the originals. There are steam recovery system and double times condensate system, it can reduce the consumption of steam;
F. Sterilization machine
Having obtained nine patented technology, take full advantages of the material's own heat exchange to save energy-- about 40%
F. Filling machine
Adopt Italian technology, sub-head and double-headed, continuous filling, reduce return; Using steam injection to sterilize, to ensure filling in aseptic state , the shelf life of product will twp years at room temperature ; In the filling process,using turntable lifting mode to avoid secondary pollution.
1) Tin packing as 70g, 198g,210g,400g,800g,850g,1kg, 2.2kg,3kg,4.5kg.
Brix: 28/30% & 22/24% & 18/20%
Lable: Lithographic label & Paper label
Tins: Easy open & Normal
2) Drum packing in 220 LITERS ASEPTIC BAG IN IRON DRUMS.
4 DRUMS/PALLET,TOTAL 80 DRUMS IN 20FCL; TOTAL NET WIGHT IS 19MT/20'FCL.
Brix: 36/38% & 30/32% & 28/30%
Process under both Cold break & Hot break
With high A/B Value and low HMC value.
3) Wooden bin packing in 1300 LITERS ASEPTIC BAG IN wooden bin.
TOTAL 16 wooden bin IN 20FCL; TOTAL NET WIGHT IS 20MT/20'FCL.
Brix: 36/38% & 30/32% & 28/30%
1. Time of Shipment : Shipped within 15 days after receiving the deposits and confirming the labels and carton marks
2. Terms of Payment: By T/T 30% of total amount in advance ,the balance upon receipt of copy of original B/Lwithin 7 days.
3. Port of Loading: Tianjin port.China
4.Delivery lead time: 30-30days
Why choose us?
1."Quality is priority”. we always attach great importance to quality control from the very beginning to the very end;
2.we have a professional manufacture experience and machining equipment;
3.we are factory ,we can provide you the super quality and very competitive price;
4.company has a quality,young,innovative and strong scientific research technical team
Is your price competitive?
surely we will give you best factory price based on superior product and service.
Any warranty?
1.one year equipment warranty after successful installation & commissioning of equipment and maintenance for lifelong time;
2.free installation and test before sending and free training for operation
3.advice for the solutions best for customers requirements
How about the test running & installation?
1.Before delivery, we finish the test over 3 times.
2.If you take integral design, no need to installation at all. If parted design, we can send our technicians to your place if necessary.
How to choose your wanted type?
1.tell us your requirement of the productivity.
2.You know about our machines ,the just tell us the type.
3.Give us the detailed information about your raw material,Picture will be best