Steel Structure Low Cost Prefab House
1). Steel prefab house, move easily and lower cost
2). Various fire resistance door, ventilated duct, translucent board, window, and shutter can be installed simply on site
3). All steel fabric parts of steel prefab house can be made according to clients requirement: board for ceiling and wall with various colors and patterns greatly improve appearance of building to meet requirement of client
4). The steel prefab house is low cost, durable structure, convenient relocation, easy to assemble and disassemble, and environment-protection,
5). Various high and low structures can be designed on steel fabric building and any wall can build subsidiary building
6). Various steel fabric building can bear hoist and guide
7). Alternating section frame designed and welded by computer can utilize material as possible as we can
8). The company prepared various double-layered floor for installing in the traditional or compound building
9). The material of steel prefab house is light and easily to installation. one 50 square meter house five workers 1-3days finished installation, save manpower and time.
10). All the materials of steel prefab house can cycle-use. And meets the require of environment protection in the world. Special is in the large-scale house projects in the developed region.
11). We used the high quality galvanized sheet and foam as the materiasl of the wall and roof . So the steel prefab house is good for fire proofing, water proofing, corrosion-resistant, sound-insulating, heat-insulating, resistance to typhoon of force 12, resistance to earthquake of force 7.
12). we can make the design of steel prefab house for you, one bedroom, two bedroom, three bedroom and any size is ok .
13). Support frame system of steel prefab house: Q235B China standarn steel structural. Square stube, Channel steel, ect
14). Wall : 75mm EPS sandwich panel: Roof : 75mm EPS sandwich panel
15). Window : Aluminum profile or PVC Window for your choose
16). Door: sandwich panel door or steel door
1)East installation and high intensity.
2)Not only beautiful shapeand but also have many colors we can choice .
3)Fast construction help us save weight and steel materials.
4)Certainly save cost.It is the real high-quality and low-cost.
1.Common type of the industrial building? Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients’ request. |
2.What’s the quality grade of the steel structure components? Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure. |
3.How about the delivery time? Reply: Usually,within 45-60 days after the order confirmed, also depends on the fabrication quantity. |
4.How about the derust grade? Reply: Ball blasting Sa 2.5 on main steel structure ; manual derust St2.0 on secondary steel structure. |
5.What kind panel used for the roof and wall? Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU. |
6.How to install it? Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if needed. |
7.Maintenance: Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time. |