Quantity(Bag) | 1 - 5 | 6 - 50 | 51 - 400 | >400 |
Est. Time(days) | 3 | 5 | 7 | To be negotiated |
Shunan base coat render of EIFS
Description
Dry-mix.polymer base coat containing Portland cement, and requiring only water for mixing.
PRODUCT INFORMATION
PRODUCT PACKAGING
• Weight: 25kg
• Color: Natural cement grey
• Shelf life and storage: 6 months after manufacturing date in dry ventilated place
• Standard: JG149-2003
• Storage: unopened bag on plate in dry place
• Production date & batch number: find on outside of bag
Water addition
Field of application
The function of this product is to protect the XPS board and fix the mesh. The finishing coat can be tile or plater, paint etc...
A comprehensive line of base coats used to embedded mesh, trowels easily, speeds mesh embedment,
reduces applicator arm fatigue, increases job site productivity..
Consumption
4.5 ~ 6 kg/m2
Technical Data
Tensile Adhesive Strength, Mpa (with foamed polystyrene) | Original | ≥ 0.10 (polystyrene board damaged) |
Water resistant | ≥ 0.10 (polystyrene board damaged) | |
Freeze - thaw resistant | ≥ 0.10 (polystyrene board damaged) | |
Flexibility property | Compressive strength/ flexural % (cement based) |
≤ 3.0 |
Cracking strain % (non cement base ) | ≥ 1.5 | |
Processing/working time h | 1.5~4.0 |
Tools
electric-mixer, trowel, bucket
Substrate requirement
1) Polystyrene board must be clean (no dust or dirt)
2) Polystyrene board must be fixed stably (Wait min 24h before applying shunan. therm epsad)
• Make sure the whole polystyrene wall is flat
Working Place For Villa In Shanghai
Remarks
1) Only mix with water, no other addition
2) The temperature of air and glue must be from 5°C~35°C
3) The glue must be used up in 2h
4) Avoid sunshine, high temperature and freezing
5) Avoid strong wind during application
6) Avoid rain during application