Welcome to brushcapital
Home >Machinery & Industrial Parts » Machinery » Energy & Mineral Equipment » Mining Machinery
Add to wish list
+ Add a New List
SINOLINKING mobile gold trommel gold mining machine
OverviewQuick DetailsCondition:NewType:Gravity Separator, mobile or stationaryProduction Capacity:98%Place of Origin:Shandong, China (Mainla
$9000 /
Stock: 10000 s
Quantity:
-+
Min Order: piece
Buy Now
Add To Cart
Send Inquiry
Seller Support:
Trade Assurance — To protect your orders from payment to delivery
Product Details
Transaction Comments
Overview
Quick Details
Condition:
New
Type:
Gravity Separator, mobile or stationary
Production Capacity:
98%
Place of Origin:
Shandong, China (Mainland)
Brand Name:
SINOLINKING
Voltage:
110v -380v
Power(W):
50KW
Dimension(L*W*H):
Customized
Weight:
14 tons
Certification:
ISO9001 CE BV SGS
Warranty:
24 Months
After-sales Service Provided:
Engineers available to service machinery overseas, Engineers available to service machinery overseas
Capacity:
50-300 tph
Recovery Rate:
98%
Gold Refinery System:
Shaker table+amalgamator+furnace
Powering System:
Diesel generator
Clay Processing System:
Heavy duty clay scrubber
Screening System:
Diesel generator
Fine Gold Recovery System:
Knelson concentrator
Coarse Gold Recovery System:
Hydraulic vibrating sluice+sluice box
Supply Ability
Supply Ability:
4 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
Packaging of Professional Gold Panning Equipment for sale
1,LCL : Wood case or channel steel frame with iron piece
2,FCL : Nude and firmed in container (20GP, 40GP, 40HQ)
Port
Qingdao
Lead Time :
Quantity(Pieces) 1 - 2 >2
Est. Time(day) 40 To be negotiated
Video Description
Description

Features of SINOLINKING mobile gold trommel gold mining machine

1) The SLK-MGT series gold washing plant are designed according to your specific mining conditions and requirements.
2) Feeding system with grizzly hopper feeder, water spray pipes inside the hopper for spray waters to the soils.

3) Heavy duty clay scrubber with inside high pressure water spray pipes for breaking off hard clay. (if required)
4) Double sieve trommel screen with NSK bearings and high pressure water spray pipes on both sides for washing, screening and separating.
5) Double gold recovery systems to ensure highest recovery rate of gold (up to 98%).
6) Water supplying systems with multiple sets of big power submersible slurry pumps, hoses, valves, etc.
7) Powering system with Cummins diesel generator with all batteries, cables and wires.
8) Multiple sets of heavy duty mining type tires with towing mechanism for fully mobility and portability.
9) Gold refinery plant to make final product of gold bars.
10) Easy for installation, operation and maintaining.
11) One-Sop gold mining solutions from A to Z.

Specification of SINOLINKING mobile gold trommel gold mining machine
Model
MGT50
MGT100
200
Parameters
Size/mm
7000*2000*3000
8300*2400*4700
9800*3000*5175
Capacity
50-80 tph
100-150 tph
200-300 tph
Power
50 kw
120 kw
150 kw
Feeder Hopper/mm
2000*2200
2200*3000
3000*3800
Clay Scrubber/mm
1000*2000
1200*3000
1500*3000
Trommel Screen/mm
1200*3000
1500*3500
1800*4000
Sluice Box
2 sets
3 sets
4 sets
Water Supply/m³
120 m³
240 m³
370 m³
Wheels
6 wheels
10 wheels
10 wheels
Recovery Rate
98%
98%
98%
Detailed Images
Technical Details


Feeding System

Name: Grizzly Hopper Feeder
Size (mm): 2000*2000 

Grizzly screen space: 150mm or as required
Grizzly material: Railway tracks
Remark: Water spray pipes along hopper sides
Function: To feed the materials evenly to the scrubber and trommel



Clay Processing System

Name: Clay Scrubber
Size (mm): φ1200*3000 or according to processing capacity
Remark: With inside water spray pipes
Function: To break off hard clays to increase gold recovery

Screening System

Name: Gold Trommel Screen
Size (mm): φ1500*3500 or according to processing capacity

Remark: 2 layer trommel screen
Function: For washing, screening and separating the minerals
Water spray pipes: On both sides of the trommel
Mesh size: 12mm and 6mm or according to clients requirment


Coarse Gold Recovery System

Name: Vibrating Sluice + sluice box
Vibrating sluice type: Hydraulic type

Size: 1m*6m
Sluice box carpet: Mitsubishi brand, imported from Japan
Function: For coarse gold recovery
Recovery rate: 99%


Fine Size Gold Recovery System

Name: Knelson type centrifugal concentrator
Processing capacity: 15tph-60tph dry solids
Quantity: 2-4 pcs
Remark: Fully continuous type
Function: For fine size dust gold recovery (-6mm)
Recovery Rate: 99%



Water Supplying System

Name: Submersible slurry pump
Quantity: 1-3 pcs
Water flow: 120-400m³ per hour
Funciton: For supplying water to the wash plant



Powering system

Name: Cummins diesel Generator
Power: 100Kw-350Kw
Brand: Cummins, Weichai, or as required
Function: supplying power to all the systems



Gold Shaker Table

Model: 6S
Power: 2.2Kw
Function: to further process the concentrates from the sluice and/or concentrators


Mercury Amalgamator

Type: V-shaped
Working mode: amlagamator + distiller retort
Function: With the help of Mercury, to extract all the gold out from the concentrates that recovered by the sluice and concentators
Recovery rate: 100%



Gold Smelting Furnace

Capacity: 10-15kg per batch
Moulds: 100g; 200g; 500g; 1000g
Function: to smelting the gold sand and make into final product of gold bars

                 Gold mixture

               Pure gold sand

      Gold bars after smelting

Our Service

Pre-Sales Service

* Receiving clients inquiry
* Studying clients mining conditions
* Introducing our machinery
* Propose the most suitable solution

After-Sales Service

* Design outlet with 3D drawing photo
* Producing according to the design

* Inspection and testing before delivery
* Engineers installation and training service overseas

Packing & Delivery
Specification of SINOLINKING mobile gold trommel gold mining machine
Container type
20'GP, 40'HQ
Container qty
1-6 pcs
Delivery time
10-30 days
Price items
EXW, FOB, CIF
Spare parts
Free spare parts avaiable
1. How long takes for installation ?
-Normally within 7-10 days if everything is ready.
2. What are the oversea service charge ?
-Airline tickets, visa fees and salary
Our Factory

Why Chose Us?

1. 15 Years factory
2. Exported to 35 countries

3. Over 300 projects worldwide
4. All customized design
5. Ensure highest recovery rate of gold
6. Short delivery time
7. Easy to install, operate and maintain
8. Super durable heavy duty machine
9. One-stop mining solution
10. Turn-key operations

FAQ

1. Are you factory?
Yes, established in 2002, over 15 years factory
2. How big are you?
In total 4 work shops, 12,000㎡, office 2000㎡, 65 workers
3. What equipment do you build?
Specialized in alluvial/placer gold/diamond mining equipment
4. Whats the capacity of the gold/diamond mining equipment
From 5TPH to 450TPH
5. What brand engine/diesel generator do you use?
Cummins, Weichai, Yuchai, etc, or as required

Contact Us


Alisa Wang


One-Stop Gold Mining Solutions>>>
with Turn-Key Operations>>>

Wechat: 18353622797
Mb/WhatsApp: +86 18353622797
Skype: 1348161328 at qq.com

Email: alisa at sinolinking.com

Related Products

Gold Mining Equipment - MGT200

Gold Mining Equipment - GT100

Gold Mining Equipment - GT200

Other products from this supplier
Back to top
X
Added successfully
You have added this product to the wish list successfully !
X
Added successfully
It has now been moved to the top of the list!
Continue shopping
X
Add a New List
Save
cancel