Q235B Steel Full Open Drawer Type Mold Rack with sliding shelves
1, Die and Mould racks are very convenient to use die / mould storage devices with a built in lifting and lowering chain hoist.
2, The drawers are sturdy and can be pulled out and pushed back with the load.
3, In order to remove a die or mould from the rack simply put out the drawer on which the mould is placed.
4, Pull the monorail trolley and the chain hoist above the mould. Attach the hook of the hoist to the mould.
5, Lift the mould with the chain hoist about 2 inches above the drawer.
6, Push back the drawer into the rack and lower the mould to the ground or to a pallet lying in front of the rack.
7, The mould can now be moved to the machine with a pallet truck. Simple isn't it.
Model | Standard/Customized |
Capacity | 1000KG~3000KG |
Shelf Size | L1000*D610(standard) |
Number of shelvels | 4 shelvles/bays |
Shelf Travle | 1, for fixed shelves only 2, half open and full open 330mm for half open(L1000*D1000) 80% of D1000(L1000*D1000) 100 full open(L1000*D1100) |
Chain Block | To lift mould fo each layer |
Number of layers | 3/4 |
Production Flow
General procedures for manufacturing rack
Packing and shipping details for rack
Please inform us the listed questions in your inquiry for quick quotation:
A) The warehouse layout plans
B) The size of mold racking(length*width*height)
C) How many bays you want
D) How many layers for each bay that you want
E) The loading capacity of each layer
F) Choose steel panel or wooden veneer
G) The RAL color you want
FAQ
1. Q: Are you a factory or trading company?
A:we are a manufacturer for mold storage rack.
2. Q: Where is your factory located? How can I visit there?
A:Our factory located in DongDuan City Guangdong Province ,China ,You can fly to Guangzhou or Shenzhen airport directly .We will pick you up on Guangzhou or Shenzhen international .All our clients ,form home or abroad ,are warmly welcome to visit us!
3. Q: What is the term of payment?
A: 1) T/T payment. 2) LC
4. Q: What is the raw material of your products?
A: As general, the raw material of steel code is Q235.
5. Q: Which port will be used as loading port?
A: Shenzhen and Guangzhou port.
6. Q: What is delivery times?
A: It depends on the order quantity and racking types
7. Q: Are samples available?
A: Yes. Short sections of samples could be provided, they are free of charge, but international courier costs to be borne by clients.
Back to Home