Welcome to brushcapital
Home >Rubber & Plastics » Environment » Adhesives & Sealants
Anhui Surmount New Materials Co., Ltd
Institutions or Social groups
ChinaVIP1Gold Supplier
Products: ind construction, automotive electronics, photovoltaic, carpenter adhesive
Response Time: within 24 hours
Response Rate: 100%
View Shop
Chat Now
Add to wish list
+ Add a New List
Pouring crack glue/road pouring glue for repairing highway road crack
OverviewQuick DetailsPlace of Origin:Hebei, China (Mainland)Main Raw Material:BitumenUsage:Construction, Road constructi
$1200 /
Stock: 10000 s
Quantity:
-+
Min Order: piece
Buy Now
Add To Cart
Send Inquiry
Seller Support:
Trade Assurance — To protect your orders from payment to delivery
Product Details
Transaction Comments
Overview
Quick Details
Place of Origin:
Hebei, China (Mainland)
Main Raw Material:
Bitumen
Usage:
Construction, Road construction
Brand Name:
CD
Classification:
Hot melt adhesive
Main raw material:
Bitumen
Color:
Black
Package:
15kg/box,16.7/box
Warranty:
1 year
Delivery time:
within 7 days
Service:
24 hours
Grade:
high quality
Softening Point:
84.2℃
Supply Ability
Supply Ability:
10000 Ton/Tons per Quarter
Packaging & Delivery
Packaging Details
neutral packing(carton box) or as your requirement
Port
Tianjin

Pouring crack glue/road pouring glue for repairing highway road crack    

 

Product Description

Road pouring glue is combined with the seam wall of asphalt concrete, with strong adhesion, watertight, good elasticity, don’t flow or stick wheel in high temperature, don’t embrittlement, good durability etc.

Feature:
1.Suitable for asphalt pavement, concrete pavement, parking crack Treatment.
2.Cracks in bridges and buildings waterproof Treatment.
3.High resistance to water damage ability and resistance to aging, long service life.
4.High flexibility, it can well adapt to dynamic changes of crack width.

Pouring crack glue/road pouring glue for repairing highway road crack

 

Usage:
1.Preparatory work before construction
Material damage usage:According to formula, when the temperature of the Sealant is in the regulation construction, 1kg Sealant can seal a crack for length is 8m, width is 1cm, depth is 1cm. The estimating formula is width(cm)*depth(cm)*length(m)*0.12(kg), for example: width and depth all is 2cm, the longitudinal crack length is 15m,then the material damage usage is 2*2*15*0.12=7.2kg.
Heating sealant:In the hot melt kettle heating chamber, sealant is heated to melt until reach the specified construction temperature 180-193℃.
2.The construction technological process and requirements
Close to traffic:To ensure the safety in construction, first the traffic should be controlled, according to the regulations about highway maintenance work traffic control by the"road maintenance technical specifications", put conical standard and moving vehicle sign, and has the specialist to charge of directing traffic and with the construction progress timely move the sign.
slotting:According to designed slotting size, adjusting the width and depth of grooving machine, then having the slotting work. Timely adjust the slotting size according to the change of the crack in the process of construction, and meet the minimum design requirements.
Raked joint:The dust and sundries in the in-groove and two sides at least 5cm should be cleaned up by forest fire extinguisher.
Preheat: Sealant should be used in the road surface temperature more than 4℃.The viscosity maybe reduced under low temperature, because of too much steam in crack, if under 4℃,a proper method can be used to heat to ensure to meet minimum requirements. If need to seal under 4℃,thecrack must be dry, no water and sundries. The temperature of sealant should be maintained in a safe heating temperature. There should be the specialist to inspect the sealant to ensure the adhesive.
Crack pouring:When the temperature of sealant is between 180-193℃,usingpressureNozzle with calibrating in the crack seal terminalto make the sealant be evenly poured into the tank.
Maintenance:After crack pouring by sealant, the traffic can not be opened immediately, but when the sealant is sufficiently cooling. Cooling time is about 15 minutes, a thin layer of sand should be sprinkled on the sealant when it is hot. Specific implementation, it can be flexible according to the temperature condition.
3.key points in the construction
1.The temperature should be between 180-190℃,but no more than 204℃.
2. Slotting size should meet the minimum design requirements, that is width ≥1cm,depth≥1.3cm.
3.Before cracking pouring, in-groove and two sides should be absolutely cleaned.
4.The road surface temperature should be more than 4℃,or preheat should be taken.
5.Before open the traffic, it should ensure enough cooling time of the sealant.

 

Pouring crack glue/road pouring glue for repairing highway road crack

Pouring crack glue/road pouring glue for repairing highway road crack

Pouring crack glue/road pouring glue for repairing highway road crack

Pouring crack glue/road pouring glue for repairing highway road crack

Pouring crack glue/road pouring glue for repairing highway road crack

Pouring crack glue/road pouring glue for repairing highway road crackPouring crack glue/road pouring glue for repairing highway road crack

Our Services

Selling Points/Reasons for choosing us:
(1) Well trained and experience sales manager to help you with any of your requirement.
(2) Professional R&D team, strong technical support.
(3) We have all specifications of our products and can meet customers’ product diversity needs.
(4) We prefer to accept your lower MOQ in order to relieve your purchasing stress.
(5)Markets are widely distributed to home and abroad and enjoy good reputation.
Our service:
(1)You can order online from us for 24 hours, 7 days.
(2)Our experienced staff answer all your questions in professional and fluent English.
(3)OEM&ODM products and customized design are available and welcomed.
(4)We can make sure that our customers receive the hundreds of orders daily from our warehouse on time and as promised.

FAQ

1.Before placing order, can we make sample firstly?
Sample can be arranged to send to you to test before placing order.
Sometimes sample is free ,sometimes sample charge should be included if more than 3 pcs with material .
But we are afraid freight charge will be paid by yourself.
Certainly, we will adjust additional sample and freight charges into your bulk order.
2.How can I get your sample?
Of course, we can send you some samples. Most samples are free, but sometimes we will take small sample fees.
Maybe you also send us your DHL or EMS/UPS/TNT etc account ,so you can pay for air freight to your carrier company directly.
3.Whether we can print our logo or need our color or size or not?
Yes, because we have our own factory and R&D team, so we can make products as your demands.
We can print your logo, we also can make as your size and print it as your color.
4.How many kinds of payment terms you can accept?
About payment terms, we would like 100%TT if less than $1000.00
Usually for bulk order , would like can be paid pay 30%- 50% advanced payment and the rest should be paid before dispatch.
We hope this information will be helpful to you, if you have any question, please feel free to contact us, we are always at your service.

Other products from this supplier
Back to top
X
Added successfully
You have added this product to the wish list successfully !
X
Added successfully
It has now been moved to the top of the list!
Continue shopping
X
Add a New List
Save
cancel