Quantity(Pieces) | 1 - 100000 | >100000 |
Est. Time(days) | 21 | To be negotiated |
ISO9001:2008
IATF16949:2009
REAL REAL REAL ! NO FAKE, NO FAKE, NO FAKE !
Process | ||
CNC Milling | Die Casting | Fastener |
CNC Lathing | Heat Sinks | Assembly Service |
Lathing & Milling | Plastic Injection | Laser Engraving |
Drawing Format | IGS,STP,X_T,STEP,DXF,Pro/E,CAD,PDF | |
Test Equipment | measurement instrument ,Projector,CMM ,Calipers.Pin Gauge etc. | |
Material | ||
Aluminum | 6061/6063/6082/2014/7075/7050/5052/ADC12/A380 | |
Stainless Steel | 303/304/3016/412/17-4/316L | |
Carbon Steel | 1018/1020/1045/A3/Q235 | |
Alloy Steel | 4130/4140/4340/40CR/42CR | |
Copper | C10100/C1100/C12200 | |
Brass Alloy | 3602/2604/H59/H62 | |
Plastic | POM/Delrin/Polyurethane/Nylon/ABS/Acetal | |
Surface Finish | ||
Aluminum Parts | Stainless Steel Parts | Steel |
Clear Anodized | Polishing | Zinc Plating |
Color Anodized | Passivaing | Black Oxide |
Sandblast Anodized | Laser Engraving | Nickel Plating |
Chemical Film | Sandblast | Chrome Plating |
Brushing | Heat Treatment | |
Polishing | Powder Coated | |
Chorming | ||
Equipments | ||
3 axis/4 axis CNC Machining Center | Punching Machine | Laser Cutting Machine |
CNC Lathes | Pressing Machine | Die casting machine |
Grinding Machine | Drilling Machine | Injection molding machine |
Milling Machine | Threading Machine | Lase Engraving Machine |
1.How can I get quotation and feedback for my products?
Provide your 2D drawings with specifications (material, surface treatment, tolerance, other requirement, etc.); Please inform your quantity usage (MOQ and annual need) and logistic requirement; 3D drawings are much welcome for full product review.
2.How long can I get the quaotation?
Normally, we can provide instant feedback and then provide quotation within 48 hours
3.How long will you produce the parts?
Production lead time for CNC machining is 1-4wks, according to difference products and quantity. We will communicate with Customers on production plan and delievery for each PO.
If a mold is needed, the mold making time will be:
1) 2-3wks for extrusion molds
2) 4-8wks for die casting molds or plastics injection molds
3) 2-3wks for stamping molds
4.What's your payment terms
1) Especailly for new customers: T/T in advance or 50% T/T in advance, left needs to be wired before delivery.
2) L/C
5.Incoterms:
1) Ex-works or FOB Shanghai, is preferied;
2) CIF
3) DDP: need further communication on cost & logistics issues with Customers
6.Shipment: By Air or Ocean
Normally by air for samples (if not too heavy)
7.Will you sign NDA?
Yes, NDA is necessary between us.
8. Refund Terms:
We support refund policy for bad products, but customers must return back the bad products and in charge of the shipping cost.