Steel Workshop, Steel Workshop, Steel Warehouse, frame Part
Use:
Workshop or Wareshouse
Color:
Red, Blue or as per your need
Connection:
Bolt
installment speed:
20 working days
Packaging & Delivery
Packaging Details
Protective packing, Steel frames will be load in 40'OT or 40'GP, roof and wall panels and others will be load in 40'HQ or 40'GP
Delivery Time
30 working days after prepayment
Details Photo
Characters
1. Wide span: single span or multiple spans, the max span clear distance is 36m, without middle columns. 2. Low cost 3. Fast construction and easy in installation 4. Long term service life: more than 50 years. 5. Environmental protection, stable structure, earthquake resistance, water proofing, and energy saving 6 Light weight ,convenient for loading and transportation
Raw Material
Q235B and Q345B
Surface
Hot-dip galvanized or painted
Roof and wall panel
EPS,PU,Rockwool sandwich panel.
Window
PVC or Aluminum Alloy
Door
Sliding or rolling up door
Cost-effective
Fast and easy installation greatly shorten the construction time which reduce the costs effectively
Life
More than 50 years
Suppy capacity
Resist winds and seismic impacts,and bears heavy snows
Drawing
We can make the design and quotation according to your require or your drawing