Product Description
JL-18 ton Horizontal Directional Driller is a new underground piping construction machinery which is based on the advanced theory of “Trenchless Technology”. With fully hydraulic and power-drive technology, it achieves drilling, rotating, back-broaching, back-towing, and travelling. It is widely used for pipeline construction and maintenance for water supply, coal gas, electric power, telecommunication, natural gas, and petroleum in railways, roads, buildings, rivers, and other construction-limited areas, such as cultural protection areas, downtown areas, crops and vegetation conservation areas.
Rubber crawler Gear and rack
F2, F5, GL350, GL600 tracking device system
JL-18 ton horizontal directional drilling machine |
Specifications |
Engine Brand | Cummins110kW/2200r |
Weight of machine | 7500kg |
Overall Dimension (L×W×H) | 5500x2170x2100 |
System voltage | 24V |
Operational |
Pullback(max) | 180kN |
Thrust(max) | 180kN |
Spindle torque(max) | 6000Nm |
Spindle speed | 0-100r.p.m |
Incidence angle | 8-20° |
Ground drive speed | 0-1.5km/h |
Grade ability | 25° |
Drilling parts |
Diameter of bit | 60mm |
Length of drill pipe | 3000mm |
Specification of backreamer | Ø200, Ø300 |
On-board fluid system |
Max pressure | 8Mpa |
Max flow rate | 250L/min |
Mud mixed ingredients system |
Mud mixing station structure | integral type |
Volume | 2m³ |
Engine system Cummins engine: It can meet complicated jobsites construction demand. The engine also has high reliability and low energy consumption. |
Mud pump Adopt ‘Leike’ mud pump which has 4 flow rates and 4 level pressures. So it can meet different diameter holes drill and pullback. The hydraulic motor drives the system, offering high pressure and stable performance. |
Push and pull device Adopt motor and chain structure, rack and pinion structure, offering stable move, huge push force, convenient maintenance and reliability. | Travel system Use the same system as excavator system’s support wheel, guide wheel, track idler, driving ring and spring. Rubber crawler or steel crawler with rubber palte has no damage to the road. Huge torque motor ensures strong grade ability. |
Clamping device The open-loop clamping structure is adopted, making the operation intuitive, convenient and reliable. | Power head Adopt ‘Tilorms’ large torque cycloid motors, power takeoff is much stronger. The two-speed rotation is controlled in the electro-hydraulic way and it is easy to operate. |
Company Information
Dongtai JuLi Machinery Manufacturing Limited Company, located in the beautiful coast of the yellow sea, Dongtai,No.9,BeiGuan road ,Economic development zone, Jiangsu province. Our factory covers an area of 80 acres, plant area of 30000 square meters, with vehicles, drilling, planing, milling, grinding and other kinds of various machine more than one hundred sets, equipped with 32 tons and16 tons gantry crane, and dozens of forklifts . The company has many years of experience in machinery manufacturing and sophisticated equipment, is specialized in designing and manufacturing large engineering machinery, horizontal directional driller and supporting tools. Because of our reliable quality, perfect service, products are sold well in China and exported to over ten abroad countries , deeply welcomed by the clients.
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.
3) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your /confirm/iation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
6) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.
7) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your /confirm/iation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
8)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
9)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.