Highling Dredger Work Boat ,Tug Boat
Foreword
Shandong Highling Dredging Machinery Co., Ltd, having dredging business since 1992, the dredger we produced is self-propelled or non self-propelled hydraulic cutter suction dredger. Dredger size from 6inch to 24inch, dismantle type and can be assembly at work place, water flow from 600m3/h to 8000m3/h, solid capacity from 120 cbm/h to 1600 cbm/h, dredging depth underwater can be from 6m to 30m with submersible dredging pump, discharge distance from 600m to 4000m with booster station; engine on the dredger can be Cummins engine or DEUTZ MAN-MAN-MWM engine accordingly; spcial dredgers can be custom made according to requirement.
The company owns blanking workshop, gold panning machinery processing workshop, machining workshop, anti-corrosion workshop, general assembly workshop, product debugging and testing center before ex-factory.
Dredger pontoons can be dismantle and shipped by truck, rail, road, and can be assembly at working place, which can be equipped with anchor booms for anchoring, and trolley for capacity increased.
Detail Description of Highling Dredger Work Boat
HLC offers a series of reliable multipurpose heavy-duty work boat designs to assist cutter suction dredger in regular operation and maintenance, the customized HLC work boat with the precise specifications to include: a pilot house, crews’ quarters, deck crane, and various other upgrades.
The cutter suction dredger workboat we produce is multifunctional flexible service boat for dredging construction works. The hull is designed assembly so it’s convenient for transport. The new type workboat is widely used for dredging workers on duty and off duty, diesel oil and hydraulic oil transporting for cutter suction dredger, floaters and pipeline replacing, spares transporting, dredger tugging and pushing, anchoring, dredger repairing, workers resting, dinner, shower taking and so on.
The boat can be designed for work site and made according to customers’ demands. We adhere to integrity, development,
Innovation and profession to be the guide line which make sure the high quality of HLC workboat
HLC multifunction workboat can benefit more on the cutter suction dredger as follow:
Maintenance on bow coupling, hoses, anchors and cutters
Logistical assistance
Bunkering and supplies
Connecting or removing floating pipeline sections
Anchoring
Towing
HLC Multi-function work boat series
240HP WORKBOAT
300HP WORKBOAT
376HP WORKBOAT
410HP WORKBOAT
2. GENERAL Specification of Highling 300HP Dredger Work Boat
Highling 300HP Dredger Work Boat | ||
1 | Manufacturer | Shandong Highling Dredging Equipment Co., Ltd |
2 | Certificate | ISO 9001 , CCS , |
3 | Total Dimension ( L*B*D) | 12.0m*6.0m*2.0m |
4 | Steel thickness ( deck*side*bottom) | 8mm*8mm*10mm (CCSB) |
5 | Load draught | 1.3m |
6 | Displacement | 80T |
7 | Diesel oil capacity | 20 cubic meter |
8 | Fresh water capacity | 3T |
9 | Deck crane lifting weight | 1.5T |
10 | Main engine | 300HP @1800rpm, Cummins |
11 | Engine Model | 6BTA5.9-GM150 |
12 | Quantity of engine | 2 sets |
13 | Quantity of gearbox | 2 sets Model : MB270 |
14 | Engine oil consumption | 41.6L/KW.H |
15 | Bottom pump | model :50ZX20-30 water flow: 20m³/h head : 30m power: 4kw |
16 | Motor-driven oil pump | model :2CY-8/0.33 water flow: 8m³/h head : 3.3m power: 2.2kw |
17 | Motor-driven ballast pump | water flow: 20m³/h head : 15m power: 2.2kw |
18 | Hydraulic windless tension | 40 KN |
19 | Windlass hydraulic pump | Model: 35VQ Power:7.5kw |
20 | Windless controlling | Manual & hydraulic |
21 | Generator | Model :X2105BCF Power :12kw |
22 | Bed No | 2 pecs |
23 | Air condition | 1 pecs |
24 | Toilet | 1 pecs |
25 | Steering engine control | Double hydraulic steering engine |
26 | Diameter airscrew | 900mm |
27 | Pilot speed | 15km/h |
28 | Anchor weight | 70 kg |
Function: workers on duty and off duty, diesel oil and hydraulic oil transporting, floaters and pipeline replacing, spares transporting, dredger tugging and pushing, anchoring, dredger repairing and maintaining, workers resting, dinner and shower taking. |
3. Tools
A complete set of tools and spare parts will be supplied with the work boat for assembly and to carry out all major overhauls, including specialists’ service tools that may be required for Industrial Diesel Engine.
4. Warranty of dredger
1) 12 months manufacturing warranty on all new installed component parts.
2) 12 months warranty on engine
3) 12 months warranty on hull and all fabricated parts.
5. Dredger Work Boat in Testing Center
Three Dredger Testing Center are Available in our Factory
In oder to guarantee good performance and safety of our cutter suction dredger, all our products will be tested in the testing center before ex-factory, it is tested like the machine working in the customer’s working site. Performance and safety will be tested and recorded in the testing process. Usually, the buyer can also surpervise the testing process before dismantle the dredg
A. Preparing work before DredgerTesting
1) Customers will be invited to watch dredger test , redio and pictures will email to buyers.
2) Every parts and connections of dredger should be checked strictly before test
3) Oil and cooling water should be ready for dredger test
B. Dredger Test Contents
1). Work condition of electricity connection of dredger should be checked .
2). Emergency pump to check operation conditions of hydraulic controlling system,
3). The speed and power of diesel engine should be tested
4). Dredging pump will be tested and rotates at different speed with fresh water.
5). In order to check the operation of various hydraulic machinery and values , The main hydraulic pump will be opened and hydraulic system load performance should be tested,
C. After Testing
1). All equipment performances and testing recorded will be printed as report for customers' reference .
2). after testing, all work about dredger dismantle should be prepared and let customer knows when and what time will do the delivery.
8. Dredger Installation
Installation of Dredger
A: The total installation of dredger will need 10-20 days
B: 2-3 skilled engineers will sent to guide the installation of dredger and train the operators.
C: Our engineer will arrive your working site within 3 days when the dredger has been transported to the workplace.
D: Buyer need to arrange 6-8 workers to assist our engineers in the process of installation.
E: Dredger should be tested for running 24 hours after the complete installation. Dredger test includes:
Operation of the sand /mud dredging
Hydraulic and electrical system operating
Running of the dredger’s outfitting equipment
9. Packing and shipping
Payment Terms
* We'll accept T/T, Western Union and L/C
*T/T: 30% of total amount in Advance as Deposit, 30% after pontoon have finished ,
40% Balance sheet before delivery.
Ways for Packaging
* In Container or Bulk
Transportation
* By sea shipment
* Photos of the final products with shipping list will be mailed you before delivery
* Remind messages for customer of the shipment
10. After –Sale Service
Hignling and Haiyang Dredger Service
l Professional technician can be provided to service the machinery overseas
l After-sales service department with 10 service engineers are available for 24 hours.
l Overseas after –sales service office built year by year.
l Sample and real dredger in factory, customer visit factory any time.
l Every dredger tested before ex-factory.
Customer invited to watch test. Video and pictures will email to buyer.
l Free spare parts provided for one year.