Welcome to brushcapital
Home >Construction & Real Estate » Formwork
Add to wish list
+ Add a New List
Good Price of of Aluminium Formwork for High Quality of Construction and Building
OverviewQuick DetailsPlace of Origin:Shanxi, China (Mainland)Brand Name:DarleysenseModel Number:Formwork System H20 BeamApplication:Concrete
$80 /Ton
Stock: 15000 Tons
Quantity:
-+
Min Order: piece
Buy Now
Add To Cart
Send Inquiry
Seller Support:
Trade Assurance — To protect your orders from payment to delivery
Product Details
Transaction Comments
Overview
Quick Details
Place of Origin:
Shanxi, China (Mainland)
Brand Name:
Darleysense
Model Number:
Formwork System H20 Beam
Application:
Concrete Construction
Material:
6061-T6 Aluminum Alloy
Type:
Wall Form
Color:
Customized
Name:
Concorete Formwork
Product name:
Concrete Steel Formwork
Usage:
Concrete Construction Support
Size:
Non-standard:custom-made
Thickness:
15mm/16.5mm
Certificate:
e: ISO9001, ISO14001
Packaging & Delivery
Packaging Details
For powder coated / anodized /polished Standard Package+Paper Extra
Plastic Protective film+Heat shrink film Standard Package+wood strip + steel trolley
Delivery Time
17-25 days after the deposit
Product Description

Product Advantages:.

1. Total system forms the complete concrete structure
2. Convenient
3. Easy operation
4. High quality
5. Light and great flexibitity
6. Durable, made of special alloy aluminum
7. No need for rehabilitation, no risk of rust and corrosion
8. Fast installation owing to its special design
9. Speed of construction-4-days each floor construction cycle.
10. Formwork can be re-used over 300 times.
11. No tower cranes required to lift the formwork from floor to floor, as the formwork is lightweight.

Why should you choose Aluminum Formwork System?
The most important aspect of a successful structural construction is the formwork system.We will always offer you the most trustful, secure, efficient and cutting edge of formwork system technology available on the market.

Speed
Due to its easiness of assembly, 4 days cycle is guaranteed compared to 7~9 days cycle for conventional formwork system.
Quality
Due to the smooth surfaces and accurately dimensioned panels, no need for plastering or remedial work after concrete casting.
Safety
No need to remove props and prop heads when dismantling slab panels.
Easy assembly
Due to its easiness of assembly, no need for skilled workers nor carpenters.
All-in-one system
With Aluminum Formwork System, brackets for wall, slab, elevator and external working platform are provided.
Mobility
The formwork to the next level can be done through material transfer box on the slab without using the crane.
Freedom of design & job site planning
Unlike tunnel or flying formwork, Our Aluminum Formwork System is a “modular” formwork. It can be used for any architectural and structural layout.
6 floors per month (4 days per floor + 6 days for uncontrollable factors e.g. access problems,unavailability of workers and etc).
Durability
A state of the art manufacturing technology using aluminum material yields its repetitive use (up to 250 times) and results in decreasing construction cost compared to conventional formwork.


Physical Display

No Need for Skilled Workers
The Aluminum Formwork System is made of lightweight aluminum which allows the largest components to be hand carried and set up. Even it does not need skilled workers due to the elaborate design provided to make sure that our clients success must be achieved.

Cost Reduction
A form designed for maximum reuse may have to be stronger and more expensive than one designed for a single use, but it can save a great deal on the total form investment. Extra features that make erection and stripping easier will add to original form costs, but labor savings may outweigh the extra cost by using Aluminum Formwork System.

Faster Construction
The Aluminum Formwork System is fast. It is not uncommon for a contractor to double or triple the output of their form crews when they convert from a wood faced form system to Aluminum Formwork System.

Unparalleled Quality
Quality control extends beyond our manufacturing plant. We are actively engaged in custom design and engineering to improve our product line. We constantly re-evaluate our products, and regularly consult with contractors, builders, and distributors. We also conduct on-site training and inspections to ensure our clients’ success.

Application

The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.

The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.

Packing & Delivery

Packaging Details:
EPE film / heat contracted plastic film / wooden packing / metal pallet or depend on clients'special requirement.
Delivery Detail:
17-25 days after the deposit

Other products from this supplier
Back to top
X
Added successfully
You have added this product to the wish list successfully !
X
Added successfully
It has now been moved to the top of the list!
Continue shopping
X
Add a New List
Save
cancel