Freight cargo construction elevator lift
Specifications:
This serial products adopts pernament magnet synchronous motor-driven system,match high performance frequency conversion gate machine system & serial communication system.Extremely low failure rate.Take safe and comfortable.Drive steady and reliable.Precise internal contro flow.Ensure full compliance with the ISO9001 quality standards.
Fix number | Load (kg) | Speed (m/s) | Car Size(mm) (Width*Depth) | Door Opening (mm) | Hoistway Size (Width*Depth) |
6 | 450 | 1.0~1.75 | 1300*950 | 700*2100 | 1800*1650 |
8 | 630 | 1.0~1.75 | 1400*1100 | 800*2100 | 2000*1750 |
10 | 800 | 1.0~3.0 | 1400*1350 | 800*2100 | 2000*2000 |
12 | 900 | 1.0~3.0 | 1400*1500 | 900*2100 | 2000*2200 |
13 | 1000 | 1.0~3.0 | 1600*1400 | 900*2100 | 2200*2100 |
15 | 1150 | 1.0~3.0 | 1600*1600 | 900*2100 | 2200*2300 |
16 | 1250 | 1.0~3.0 | 1750*1600 | 1000*2100 | 2350*2300 |
18 | 1350 | 1.0~3.0 | 1800*1650 | 1000*2100 | 2400*2400 |
21 | 1600 | 1.0~3.0 | 1950*1750 | 1100*2100 | 2900*2300 |
Load (kg) | Speed (m/s) | Over Head (mm) | Pit Deepth (mm) |
450~1600 | 1.0 | 4500 | 1500 |
1.5/1.6 | 4600 | 1600 |
1.75 | 4700 | 1700 |
2.0 | 4800 | 1800 |
2.5 | 5000 | 2200 |
3.0 | 5400 | 2500 |
FAQ
Q1.What is the MOQ of small home elevator lift?
A: Our home elevator MOQ is one set.
Q2. If your engineer come to our country to fix the elevator and do some training, how much will it cost?
A: The cost mainly contains the cost of round-trip flight tickets, board and lodging as well as visa fee. Staff cost is normally 100USD/day/person. But it will depend on a large equipment or installation and debugging of the complete elevator.
Q3. What is the Payment Terms?
A: Via T/T.
Deposit: 50% of total contract amount within 3 days after the contract day;
Balance: 50% of total contract amount within 3 days before the shipment.
Or L/C at sight.