Abs beer 4l 5l 6l keg bucket electric beverage beer cooler with adaptor
Features:
1. Advanced thermoelectric cooling system to keep your beer ice cold;
2. Highly versatile unit can dispense 4,5,6-liter gravity kegs, such as sold by Coors, and pressurized kegs, such as sold by Heineken as DraughtKeg! ;
3.Can function on either AC or DC to make this a truly protable keg cooler and dispenser.
4. Removable drip tray for easy cleaning. ;
This Beer Cooler add a mini pump and handle.For your convenient operation,we provide you with the adaptor .
Product name:LYB10T Thermoelectric Beer Fridge |
Capacity | 4L,5L,6L Keg | Main material | ABS |
Cooling capacity | 5°C in 6 hours | | |
Cooling system | Thermoelectric cooling technology | | |
Voltage | 110-220V AC 12V DC | Power consumption | 60W+/-10% |
Diamentions | L46*W43*H56 | Loading quantity | 250 pcs/20'GP 526 pcs/40'GP 624 pcs/40'HQ |
Net weight | 6.6KGS | Gross weight | 7.5 KGS |
Shangyu North Electron Manufacture Co., Ltd is a integrated enterprise with Research & deplopment, Manufacture and Service. The total staffs in our factory is 230. Each year, the sales can reach up to 15 million dollars.
Main Production: Thermoelectric cooler box, Car industrial freezer price, Beer cooler, Drink machine, Freezer.
Our factory has been certified by ISO 9001-2000.
Certifications: CCC, CE, GS, ROHS, ETL, Emark.
Partners:There are more than 30 patents from us approved each year.
Packaging for Beer Fridge |
Packaging Details: Carton |
1 pcs in a shipping carton (47*44*57cm) |
|
N. W.: 6.6KGS |
G. W.: 7.5KGS |
250 PCS per 20' Container [ 20' GP ] [ 28 m³ ] [ MOQ ] |
526 PCS per 40' Container [ 40' GP ] [ 58 m³ ] |
624 PCS per 40' Container [ 40' HQ ] [ 68 m³ ] |
|
Delivery for Beer Fridge |
Delivery Detail: 30 days after receive the payment |
1. What’s the MOQ?
Generally speaking, considering the market testing for our new customer, we have no requirement on the quantity for 1st order, while the 2nd order must be 20GP at least.
2. What’s the Payment term?
At present, we accept payment terms, such as,T/T, L/C.
30%TT in advance and balance 70% against copy of full shipping documents.
L/C at sight.
3. What’s the time of delivery?
In 45 days after the order confirmed.
4. Where is your factory?
Yuexie Road, Shangyu, Shaoxing city, Zhejiang Province, China.