Seek to purchase
Home >Machinery & Industrial Parts » Machinery » Building Material Machinery » Plaster of Paris Machines
HENGSHUI DECHENG MACHINERY & EQUIPMENT CO., LTD.
Business units
ChinaVIP0Audited Supplier
Products: Gypsum Board Production Line , Gypsum Powder Production Line , Castings
Response Time: within 24 hours
Response Rate: 100%
View Shop
Chat Now
Add to wish list
+ Add a New List
Milling/Calcining System of Plaster Powder Line
$100000.00 /set
Stock: 1000 sets
Quantity:
-+
Min Order: 1 piece
Seller Support:
Trade Assurance — To protect your orders from payment to delivery
Product Details
Transaction Comments
Basic Info
  • Model NO.: DCIP011
  • Control Type: PLC
  • Automatic Grade: Automatic
  • Production Scope: Product Line
  • Service: Engineer Oversea Service
  • Transport Package: Seaworthy Packing
  • Origin: China
  • Certification: ISO 9001:2008, ISO 9001:2000, SGS, CE, ISO
  • Crushing Degree: Fine Grinding Machine
  • Automatic Production Line: Assembly
  • Rhythm: Flow Producti
  • Trademark: DCI
  • Specification: ISO9001
  • HS Code: 84742090
Product Description
Introduction of gypsum powder machine with Top quality:
Milling/Calcining System of Plaster Powder Line


1. Controlling Part: Full Automatic

2. Capacity: Gypsum Powder Plant: 30, 000-300, 000 Tons Per Year

3. Fuel: Coal, Natural Gas, Heavy Oil, Diesel

4. Raw Material:
1)Gypsum Powder Plant:
A)Natural Gypsum Rock. Content of CaSO4@2H2O >80%.
B)Desulfurization Gypsum
C)Dephosphorization Gypsum

5. Quality Standard:
Gypsum Powder Quality Standard: GB/T 9776-2008
Gypsum Powder: 80-100mesh
The Initial Setting Time: Shall Not Be Less Than 6 Minutes,
The Final Setting Time: Shall Not Be More Than 30 Minutes

6. Main Technology
Gypsum Powder Plant(Nature Gypsum Rock)
Gypsum Mine - Crushing - Grinding - Calcining - Aging -Finished Products (CaSO4.1/2H2O)

 
Controlling Part Full Automatic / Semi-Automatic
Annual capacity Customized (30, 000-300, 000 Tons Per Year)
Calcining system Ebullition furnace
Rotary kiln
Fuel Natural gas, diesel, coal, heavy oil
Raw material Natural Gypsum Rock (Content of CaSO4@2H2O >80%.)
Desulfurization Gypsum
Dephosphorization Gypsum
Finished powder usage Gypsum board
Putty
Plaster powder
Quality standard 80-100mesh
The Initial Setting Time: Shall Not Be Less Than 6 Minutes,
The Final Setting Time: Shall Not Be More Than 30 Minutes
Milling/Calcining System of Plaster Powder Line
Other products from this supplier
Competitive Gypsum P
100000.00/set
Good Performance Pla
350000.00/set
Affordable Price Gyp
100000.00/set
Dci Efficient Gypsum
100000.00/set
Gypsum Powder Produc
100000.00/set
Back to top
X
Added successfully
You have added this product to the wish list successfully !
X
Added successfully
It has now been moved to the top of the list!
Continue shopping
X
Add a New List
Save
cancel